This feasibility study examined options for additions
and alterations to Fields Road Elementary School,
an existing 47,140 square foot school constructed
in 1973. This was performed as a two-fold study:
in order to meet the immediate needs of the school
in terms of additional space required and described
below, as well as how the proposed fits in to the
overall modernization of the school (the date of
which has not yet been determined). The following
list represents a summary of our scope of work
for this project:
| |
 |
The scope of work for the
initial feasibility included the following new
spaces: 2 Kindergarten rooms at 1,300 SF each,
7 general classrooms at 900 SF each, an ESOL room
that is an overall 900 SF classroom with a gypsum
board wall dividing it in half, and approximately
500 SF for additional administration areas. The
education specifications provided by MCPS were
utilized to complete this study. |
| |
 |
The current number of students at the
school is 559. The ultimate capacity of the school
is projected at 640 students. This projected 640-student
capacity was used for our review of the existing
facility including restroom toilet/lav counts,
codes, etc. |
| |
 |
Three options for the proposed additional
space were analyzed for the short term, and then
each analyzed as part of the Master Plan for the
future modernization project. Detailed cost estimates
were completed for the three short-term options
only. In regards to the overall masterplan and
modernization work for the future modernization,
we provided square foot areas to be added to the
building, demolition square foot areas, and square
foot areas to be renovated |
|